Projects – Product

Projects – Product

<< Back to ProjectsProjects by Application PageProjects By Location Page

Find applications for a specific B&R’s product. This would, for example, allow you to see what a Monarch IP has been used for. Click the filter links below to see only the products you are interested in.

  • All
  • Ausrack Plus
  • Ausrack Plus Server
  • Cold Aisle
  • Connector TE
  • Connector TE SS
  • Control Enclosures
  • Custom Enclosures
  • Data Cage
  • Field FC
  • Hazardous Areas Enclosures
  • Hazardous Areas Lighting
  • Horizon Q series
  • Horizon Series
  • iLINQ
  • Incline SR
  • Infinity 3G
  • Monarch IP
  • Monarch IP ZS
  • Pilbara SP
  • Rail Cabinets
  • Signature SE
  • Sloping Roof
  • Universal NI

Solomon Power Output-Based Aid Program

Solomon Power is managing an Output-Based Aid project. The program helps low income households pay the initial connection fee to access grid electricity.

Oyu Tolgoi Mine

The Oyu Tolgoi mine required custom switchboards, PLC panels, local control stations and enclosures for use on the mine site.

BHP Olympic Dam

BHP wanted to create a fibre enclosure hub which would be used to link a fibre ring underground with the surface.

Banyuwangi LPG Terminal

Banyuwangi LPG terminal required lighting and enclosure solutions for hazardous areas. B&R supplied enclosures and lighting solutions for this project.

Padstow Gardens Switchboards

Padstow Gardens is a new residential development in Brisbane. D&L were contracted to complete electrical works for the 18 townhouses. B&R provided an Infinity 3G modular switchboard for this project.

Steeline Warehouse Switchboards

Steeline Metal Framing Systems required switchboards for their new factory and office south of Brisbane. Sherriff Electrical Wholesalers at Albion engaged B&R to supply Infinity 3G switchboards.

Aspect on Archer

D&L Williamson Electrical engaged B&R to supply switchboard and metering solutions for the development’s electrical supply for Aspect on Archer.

YourDC Data Centre

YourDC needed a modular server rack design with cold aisle containment that could easily be replicated across multiple rooms in their new state of the art data centre in Adelaide, SA.

Ichthys Gas Field

Atlantic, Gulf and Pacific (AG&P) was contracted to undertake the design and construction of on and off-shore modules for the Ichthys Gas Field located off the coast of Western Australia.

Techsys Re-Injection (MAR) Enclosure

Techsys Corporation designed and built the control panels for FMG for the controlled re-injection of ground water back into ground water systems.

Roy Hill Climate Ready Enclosures

The two year turnkey project required a technically superior solution to transport up to 55 mtpa of iron ore with five daily 232-wagon trains.

Kincumber Sewage Treatment Plant

The switchboard is designed to run with the 2 power supplies but if one fails then the switchboard will automatically connect to the good power supply.

Weston Milling Overhaul

Weston Milling, located in Brisbane South required an overhaul of all their electrical equipment and enclosures after damage occurred during the 2011 floods.

Townsville City Council

B&R Enclosures was contacted to find a replacement enclosure capable of being installed at different locations affected by vandalism, weather conditions and general ageing.

Total Marine Technology

Total Marine Technology (TMT) is an Australian based company who specialise in the design, engineering, building and operation of ROVs (Remotely Operated Vehicles) and subsea tooling.

Tallowa Dam

The Tallowa Dam project sought to achieve environmental flow releases of water into the Shoalhaven River to improve downstream river health.

Sydney Ports, Patrick Terminal

In October 2006, David Byrnes contacted B&R Enclosures about supplying stainless steel enclosures for the land side operation of the Sydney Port Upgrade.

RTA Early Warning System

One of the basic considerations for this project was to improve reliability of the system and to make the replacement of units easier.

River Murray

Water Engineering Technologies required a control enclosure and separate supply authority metering enclosure as part of a $200m salt interception scheme.

Pump Control Panels A-Line Switchboards

The need for a range of enclosures pre-punched to suit the large amount of control and monitoring equipment installed.

Polaris Data Centre

Dalkia, Facility Managers of Polaris Data Centre needed to segregate and secure customer data centre co-location space.

Pipe Networks Data Centre

The project required a custom solution to solve a number of unique challenges including spacial limitations, a need for specialised secure infrastructure and on-site tenant security.

Peninsula ECO Project

The Peninsula ECO Project required the construction of 15.4km of transfer main and pump stations as part of the Southern Mornington Peninsula Blacklog Sewerage Scheme.

OK Tedi Mine Papua New Guinea

Five cathodic power units had to be installed on a pipeline in an area of extreme rainfall (1 metre/month) and high humidity.

North Parkes Gold Mine

Ampcontrol RES asked JA Martin Electrical to design and construct a 1000V Power Distribution Switchboard for North Parkes Gold Mine in central west NSW.

Midfield Meats

Midfield announced $20 million worth of upgrades earlier in the year, to be rolled out over a two year period.

Gold Coast University Hospital

The Gold Coast University Hospital project demanded a secure and innovative IT infrastructure solution to manage sensitive patient information and ensure peace of mind.

Glendale Pump Station

The Hunter Water Corporation (HWC) were looking for a permanent solution to a critical problem, with the quickest turnaround time possible.

Fiona Stanley Hospital

The $2 billion Fiona Stanley Hospital in Western Australia required a complete data cabinet and equipment solution. This new state-of-art facility provides unparalleled levels of accessible, integrated and evidence-based patient-centric care.

Dry Creek Rail Yard

A special enclosure design was required to help with heat dissipation inside the enclosure and increase the IP rating.

Dampier Salt (H.I) North Shore

The application required robust enclosures, to cover a range of environmental conditions, that also addressed O.H.S.

Cairns Regional Council

Cairns Regional Council required several enclosures to house their level monitoring stations which were being installed to monitor their water supply.

Brooklyn to Lara Gas Pipeline

Cathodic power unit installed on the Brooklyn to Lara gas pipeline project in Melbourne’s Inner West.

Brockman 4 Iron Ore Mine

JA Martin Electrical won the contract to build and fit-out another transportable train loader control room for the BHP owned Brockman 4 iron ore mine in the Pilbara region of Western Australia.

AuScope CORS Project

AuSCOPE CORS is a network of Global Navigational Satellite System Continuously Operating Reference Stations located around Australia which form a part of the federally funded AuScope program.

Anderson Point Expansion

Fortescue Metal Group are expanding their iron ore capabilities to 155 Million Tonnes per year at Anderson Point in Port Hedland WA.

AMC Oil & Gas

AMC Oil & Gas, located at Sumner Park in Queensland is a leading provider of mud products to the global oil and gas market.